PENSACOLA NEARS COMPLETION




The open front porch is complete.  We used red cedar for the majority of the porch components with a metal grid panel for the railing inserts.  This provides for the required safety barrier but is also very open for un-obstructive views.  A beadboard ceiling was installed for the porch ceiling.  This will be painted white and have cedar trim boards. The cast concrete base blocks were painted gray to provide a uniform contrasting color.  .





The large rear deck will be a great area for entertaining and relaxation.  The large maple
tree was preserved and pruned.  This tree will provide some summer shade from the southern sun exposure.  

rear deck

The  four bathrooms have the tile installed on the floors and walls. The master bathroom has black and gray geometric floor tile with white large format subway tile on the shower walls which creates a great graphic contrast.    

bathroom #2

master bathroom

The renovation of 4909 West Pensacola is in the final stages of completion.  Door and trim will be completed next week.  Counter tops, carpet and final finishing after that.  Then a complete house cleanup and house staging.   

Look for our upcoming OPEN HOUSE in September.  